Mount Glorious

December 3, 2013 in Completed Projects

This project involved slip remediation of three sites on approximately 2.5 kilometres of road along the Samford-Mount Glorious Road.

Scope of Works included:

  • Gabion Retaining Walls
  • Earthworks
  • Pavements
  • Guardrail
  • Sealing Works
  • Traffic Manager

 

 

Maranoa Bridge Replacement

November 18, 2013 in Completed Projects

This project involved construction of a new bridge, demolition of the existing bridge, construction of new approaches to the new bridge approx. 160 metres on the town side and approximately 250 metres on the Eastern side. The Maranoa Bridge was a Joint Venture with Albem.

Scope of Works included:

Bridge Works

  • Subsurface Drainage
  • Protective Treatments
  • General Earthworks
  • Bridge Substructure
  • Cast-In-Place Piles
  • Prestressed Concrete Deck and
    Kerb Units and Transverse Stressing Units

Road Works

  • Demolition of Culverts
  • Supply and Installation of Culverts
    and End Structures
  • Pavement Drainage
  • Subsurface Drainage
  • Protective Treatments
  • General Earthworks
  • Unbound Pavements
  • Sprayed Bituminous Surfacing
  • Roadside Structures
  • Guidance and Information Systems
  • Planting Media
  • Linemarking
  • Road Lighting

Torbanlea Intersection

March 21, 2012 in Completed Projects

This project involves 700 metres of pavement widening, strengthening and placement of full depth heavy duty asphalt pavement on the Bruce Highway at the Torbanlea intersection, north of Maryborough. Intersection upgrade and provision of extra turning lanes is also included in the contract.

Scope of works included:

  • 8000 tonne of asphalt
  • 3000 m3 of cement stabilized road base construction
  • 900 m of kerbing and kerbing and channel
  • 4000m3 of road embankment
  • 3000 m2 of rock fill shoulder subgrade replacement
  • 800 m2 of coloured median infill
  • Milling 6000 sq metres and removal of existing pavement
  • 16 new rate 3 street lights
  • 800 metres of electrical conduits and cabling, including under-road boring
  • Upgrading  street, warning and destination signage
  • Upgrading of the Torbanlea turnoff from the Bruce Highway

Calliope Accommodation Camp

February 8, 2012 in Completed Projects

This project involved the design and construction of the first stage of a 2,500 room construction camp in Calliope for work in at the Gladstone region.  The project included:

  • 40,000m³ of earthworks
  • 7,500m³ of road base construction
  • 3,200metres of kerbing
  • 2,300mm of storm water pipes
  • two water reservoirs
  • 8,300m² of concrete pavements
  • 1,000 tonne of DG14 asphalt sufacing
  • Sewerage treatment plant
  • Portable water treatment plant
  • 15 new street lights
  • Construction of 1,200 person dining room and kitchen
  • Construction of 240 double story accommodation units

Maria Creek Bridge

October 10, 2011 in Completed Projects

The project involves demolition of an existing timber bridge in an environmentally sensitive area, piling foundations, construction of a pre-cast girder deck bridge, relocating of services,construction of approaches and bitumen sealing roadway.

Scope of works included:

  • Demolition of existing timber bridge
  • Excavation of 1500 m³ for bridge approaches, waterways and structures
  • Excavation of 150 m³ for cast in situ piles
  • 100 metres of 1200mm dia in-situ reinforced concrete piles
  • Construction of reinforced concrete abutments and wingwalls
  • Supply and erection of 15 precast deck units
  • Pouring of pedestrian walkway, relieving slabs and kerbs
  • 20 metres of reinforced concrete culverts and associated structures
  • 1000 m² of ground treatment under embankment and in subgrade
  • Fabrication and erection of 60 metres of guard rails and balustrade
  • 250 m² of DG 14 asphalt deck wearing surface
  • Relocation of utility services onto the new superstructure
  • Line marking of new roadway and erection of road furniture