This project involved construction of a new bridge, demolition of the existing bridge, construction of new approaches to the new bridge approx. 160 metres on the town side and approximately 250 metres on the Eastern side. The Maranoa Bridge was a Joint Venture with Albem.

Scope of Works included:

Bridge Works

  • Subsurface Drainage
  • Protective Treatments
  • General Earthworks
  • Bridge Substructure
  • Cast-In-Place Piles
  • Prestressed Concrete Deck and
    Kerb Units and Transverse Stressing Units

Road Works

  • Demolition of Culverts
  • Supply and Installation of Culverts
    and End Structures
  • Pavement Drainage
  • Subsurface Drainage
  • Protective Treatments
  • General Earthworks
  • Unbound Pavements
  • Sprayed Bituminous Surfacing
  • Roadside Structures
  • Guidance and Information Systems
  • Planting Media
  • Linemarking
  • Road Lighting